Stump the Panel » Site Managers and Site Collection Managers

Subcription ran at wrong scheduled date

(1 post)
  • Started 3 months ago by bkwmcg

Tags:

  1. bkwmcg
    Member

    I have a subscription in SharePoint that runs a report . It is scheduled:
    Frequency: Month
    Schedule: Months:Jan, Apr, Jul, Oct Days: 1 Start Time: 1:00 AM

    The problem is that is ran 11/01/2008 at 1AM. It should not have ran until January.
    I have other subscriptions sceduled with the same setup and they run as scheduled. Any idea what could have happened with this one.

    Posted 3 months ago #

RSS feed for this topic

Reply

You must log in to post.